Pune: Flyover Construction without signals

Hi All,


On the Mumbai-pune Highway, a flyover on the road to Wakad (Hinjewadi Infotech park), is being constructed since a year now. There are no signals for the crossing road. It is really very difficult to cross the highway, having two way traffic moving with high speed. Moreover, due to the highway construction, the road has been shortened.


Normally, vehicles cross the highway halfway and halt at the center waiting for the traffic on the other side to clear. This is very dangerous since more vehicles halt at the center thereby causing accidents. To add to this, the center portion has a gradient and releasing of the brakes tend to move the vehicle back; bumping into vehicle behind it.


The flyover construction will take atleast six months to complete looking at the current pace. PCMC should atleast put on signals to ensure that the traffic flow is smooth and there is sufficient light especially during nights.


Regards.