I liked the flat and concept and everything. It was delayed but then it happens with projects
now its almost four months, since it was a new project, We had to fix a lot of issues
leakage.switches were mismatched. Had requested for three pins for fridge in kitchen but we had it in our dining area. got it fixed after moving in.
No cable for TV.when asked they said you had asked to change the TV direction which was not informed and later had to pay and get it done,
Now major issue is Seepage on almost every wall.and worst is poor quality wood used for door beams.we even get mushrooms on the inner side of the door beams which looked perfect when new. I was dreaming of villas. but now I am sure it wont be manjeera.
I am sure many arent facing any issues. but there are many who have the same problems which I am facing.