I regret to state Sobha Limited(SL) has failed to deliver on its promisedInternational Quality Standards in its Carnation project at Pune. The buildings(two blocks) are a little over six years in age, but the major flaw is in the cement plastering work, that is woefully pathetic. The buildings have developed enormous surface cracks, both external & internal of various size and shapes. Consequently, seepage during rainy season is very real, especially from West/ South West facing walls. Thus these walls become damp and musty. My complaints relate to surface cracks within the flat, at various locations, is pending with SL, post 2016 rainy season. Unfortunately, SL has failed to conduct repairs in my flat on various grounds, namely(a) the building warranty period has expired and(b) the project account books are closed(c) diurnal variation in temperature are responsible for the external cracks. However, thewater proofing warranty clause for our project is still current, but SL has not shown the urge to progress on repairs. I have attached two pics showing hair line crack/ seepage.