Lets proceed with multiple parameter, I owned in this society
construction quality is Average
Duck area having security glitch - Not safe for elderly and small kid
Plumber fitting - pipe lower brand
Quality check system before handover - No checks as had issues
Tiles - Many faulty tiles installed no inspection performed before handover
Amenities - Till now only swimming pool and kids play area very small
Open area for walking and other stuff-limited
Project inception 2017 and handed over 2024 jan.
Good:
Budget property
On main road
Will I recommend to others this buider - No